Project Brief

Location: Leatherhead
Time: 4 Weeks

The client approached us to refurbish all toilet blocks within their large office complex, which had grown tired and outdated over the years. Their goal was to achieve a fresh, modern design that improved both aesthetics and functionality, incorporating contemporary fixtures such as sensor-activated taps and flushes.

Toilet block refurb banner
Toilet block refurb Feature sq

5 Key Steps in the Design Process

01

Understanding Needs

We began by discussing staff and visitor requirements, identifying key improvements in functionality, hygiene, and design appeal. This informed the concept direction and product selection throughout.

02

Concept & Visualisation

Multiple design concepts were presented to the client, after which we developed high-quality 3D renders to bring the proposed designs to life. This collaborative approach allowed for informed feedback and fine-tuning of the final scheme.

03

Implementation Strategy

To minimise disruption, we installed two large temporary WC units at the rear of the building. Weekend strip-outs were scheduled to ensure the client’s operations remained uninterrupted during the refurbishment.

By combining modern design with practical functionality and a smooth delivery process, we revitalised the WC facilities to better reflect the client’s standards and enhance the everyday experience for building users.

05

Detailing & Delivery

From custom mirror splashbacks to porthole interior doors, every element was thoughtfully detailed to align with the modern aesthetic. Finishing touches such as LED strip lighting, PVC cladding, and updated signage completed the transformation.

04

Material & Fixture Upgrade

We specified durable, hygienic finishes and smart fixtures such as sensor taps and flush systems. All new sanitaryware and finishes were selected to create a unified look across all refurbished spaces, while meeting contemporary standards.

What we did

  • Design consultation meetings with the client
  • Design and supply of conceptual 3D renders
  • Supply and installation of temporary WC blocks
  • Strip out of existing WC sanitaryware and finishes
  • Take up of existing tiles and floor preparation
  • Supply and installation of new tiles
  • Installation of new water heaters, TMVs, and plumbing adjustments
  • Installation of all new sanitaryware and WC furniture
  • Installation of mirrors and splashbacks
  • PVC wall cladding for hand dryer areas
  • LED strip lighting above mirrors
  • Wall and ceiling decoration
  • Alteration of doors, including new porthole details
  • Installation of health & safety notices and signage
  • Full O&M manual provided on project completion

What our clients say…

Creed-Miles Preferred Partner for Outstanding Offices.

icon teamwork

Professional,
Friendly Experts

Our reliable and easy to work with team puts your needs first.

icon management

Project Manager

You will have a dedicated project manager on your side from sales enquiry to project completion.