Project Brief

Client: KBR
Areas of work: Male & Female WC & 2no Kitchenette Areas

Sector: Corporate Facilities

The client required the refurbishment of a male washroom and adjacent kitchenette space to align with modern hygiene standards and visual consistency across their facilities. The aim was to deliver a sleek, durable finish suitable for daily high traffic use while ensuring minimal disruption within an active workplace.

5 Key Steps in the Design Process

01

Live Site Planning

The works were sequenced to allow continual operation of adjoining facilities. Temporary barriers and shift-based scheduling ensured quiet working hours were maintained, particularly during critical periods.

02

Kitchenette Strip-Out & Upgrade

Existing units and worktops were removed, and the room was prepared for a full retrofit. We installed high-gloss cabinetry, integrated Lamona appliances, a modern worktop, and a stainless-steel sink. Safety vinyl flooring and PVC wall cladding were applied to meet hygiene and durability standards.

03

WC Block Demolition & Prep

The washroom was fully stripped back, including urinals, cubicles, flooring, and wall panels. The layout was re-assessed to optimize spatial efficiency while enhancing privacy and accessibility.

By combining modern design with practical functionality and a smooth delivery process, we revitalised the WC facilities to better reflect the client’s standards while also providing a new kitchenette for the staff.

05

Final Finishes & Quality Checks

We completed the project with full redecoration, high-grip tiled flooring, new lighting, and ceiling updates. Mechanical and electrical compliance was coordinated with the client’s onsite team, followed by a detailed handover including O&M documentation.

04

Reinstallation of Sanitary Fixtures

New sanitaryware was installed, including wall-hung urinals and Alterna WCs. Vanesta cubicle systems and flush wall panelling created a sleek and easy-to-clean surface. Toilet paper dispensers, bins, and other fixtures were selected to match existing corporate standards.

What we did

  • Phased refurbishment of male WC and kitchenette

  • Full strip-out of existing sanitaryware, cubicles, units, and finishes

  • Floor prep and installation of ceramic and safety vinyl flooring

  • Hygienic wall cladding with welded-joint PVC panelling

  • Fit-out of new urinals, WCs, and cubicle systems

  • Installation of all new sanitaryware and WC furniture
  • Updated lighting and ceiling ventilation components

  • Coordination with client’s on-site M&E team

  • Handover with compliance certificates and full O&M pack

What our clients say…

Creed-Miles Preferred Partner for Outstanding Offices.

Office fit out.

Professional,
Friendly Experts

Our reliable and easy to work with team puts your needs first.

Project Manager

You will have a dedicated project manager on your side from sales enquiry to project completion.

Collective Knowledge

We then bring together the collective knowledge of our full office fit out team to ensure we deliver the best service and results, on time and to budget.