BRIEF

The client asked us to strip out and modernise their reception area, including all new mechanical, a new TV mount for internal advertising and a breakout work area for staff to have informal meetings, whilst retaining their existing bespoke reception desk and creating a scheme where this would still work.

THE SOLUTION

After a site meeting and an original design concept was discussed, we had some CAD plans drawn up of the respective area.

We put together various mood boards and design concepts for the client and once the design was agreed we set about finding the best solution to replace the mechanical elements with more up to date systems.

WHAT WE DID

  • Design consultation meetings with the client

  •  Design and supply of details CAD drawings

  • Strip out of existing mechanical and furniture

  • Removal of existing reception desk and kept to one side for reinstallation

  • Supply and installation of all new Mechanical

  • Supply and installation of new black lay in ceiling

  • Supply and installation of new lighting

  • Supply and installation of new flooring both carpet tiles and LVT

  • Supply and installation of new wall graphics

  • Supply and installation of all new furniture including work booths

  • Supply and installation of new automatic doors for the main entrance

  • Re-installation of existing feature reception desk

  • Installation of new TV