Retail Refurbishment Case Study
Create a light, bright, spacious retail space within a very strict 4 weeks period

retail

Ilford

4 Weeks

BRIEF

To interpret concept plans from the clients chosen designer and bring to life an old dark and dingy restaurant space into a light, bright, spacious retail space within a very strict 4 weeks period.  

THE SOLUTION

From receiving the design package from the client these were broken down to bite sized chunks to be able to obtain the full required of what was needed to be achieved before meeting the client on site.

When meeting the client on site to discuss the designs with all required contractors we ironed out many of the pitfalls there and then and eliminated many of the issues that could have crept up along the way.

After having completed the above, a full in depth quotation was produced with samples of all finishes. The client was then invited to our design studio for a detailed presentation for sign-off of the works and all finishes.

WHAT WE DID

  • Complete CDM package
  • Designated CDM Principal Contractor role
  • Installation of new plasterboard cladding to walls, partition walls, changing rooms and kitchen to back of house  
  • Internal decorations to 5 metre high ceilings, all walls and skirting boards
  • External shop front decorations
  • Installation of all new electrics, lighting rigs and data points  
  • New Milliken luxury vinyl tiles to all areas
  • Design, supply and installation of bespoke joinery and display items
  • Supply and installation of bespoke illuminating shop signage
  • Design, supply and installation of bespoke wall art
  • Management of new installation of HVAC and fire alarm systems

bring to life an old dark and dingy restaurant space into a light, bright, spacious retail space

×