Create a light, bright, spacious retail space within a very strict 4 weeks period
retail
Ilford
4 Weeks
BRIEF
To interpret concept plans from the clients chosen designer and bring to life an old dark and dingy restaurant space into a light, bright, spacious retail space within a very strict 4 weeks period.
THE SOLUTION
From receiving the design package from the client these were broken down to bite sized chunks to be able to obtain the full required of what was needed to be achieved before meeting the client on site.
When meeting the client on site to discuss the designs with all required contractors we ironed out many of the pitfalls there and then and eliminated many of the issues that could have crept up along the way.
After having completed the above, a full in depth quotation was produced with samples of all finishes. The client was then invited to our design studio for a detailed presentation for sign-off of the works and all finishes.
WHAT WE DID
Complete CDM package
Designated CDM Principal Contractor role
Installation of new plasterboard cladding to walls, partition walls, changing rooms and kitchen to back of house
Internal decorations to 5 metre high ceilings, all walls and skirting boards
External shop front decorations
Installation of all new electrics, lighting rigs and data points
New Milliken luxury vinyl tiles to all areas
Design, supply and installation of bespoke joinery and display items
Supply and installation of bespoke illuminating shop signage
Design, supply and installation of bespoke wall art
Management of new installation of HVAC and fire alarm systems